User Tools

Site Tools


Writing /home/help/public_html/dokuwiki/data/cache/6/65768ba8ea9131e6f7bc370e39d8b6ba.metadata failed
operations

====== Differences ====== This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations [2015/01/22 23:28]
shneor
operations [2016/02/01 22:02] (current)
help
Line 1: Line 1:
 +====== Operational Goals of the Davis Gig Network ======
 +
 + What do we want to do with a fiber optic community network aside from just "​faster better bandwidth?"​\\
 +
 + This is a major network infrastructure project that we could use for decades. As it is the community that is calling for it, and authorizing the purchase of the infrastructure. Lets agree on some design parameters we would like to see built into the network. ​
 +
 +As a personal advocate of the network I'd hold these first 5 or so design elements to be core to the original concept. Others along the way have brought up additional design elements which could be built into the network.
 +Also see the [[advantages]] page.
 +
 +  * Built throughout the community, not just the downtown core. All homes, apartment complexes, businesses, schools, govt buildings and parks facilities. ​
 +  * Overbuilt capacity at the edges to support adjoining ag land fiber build outs and new subdivisions.
 +  * Open Access/Open Interconnect to the infrastructure overseen by 501c3 non profit community network
 +  * Fast and redundant peering with UCD Network
 +  * A network design {{:​nv_data.pdf|(SDN?​)}} so End Users can create temporary or permanent VLANs to exchange data without going through the public Internet
 +
 +  * Interconnect to Woodland along existing fiber on Rd 102. Interconnect to the downtown Sacramento core fiber ring.
 +  * Smart water meters, Smart sprinkler systems, water use telemetry.
 +  * Community Technology Center at the network hub or (peering point) that offers ​
 +  * Network Hub 100% alternative energy with diesel backup ​
 +
 +
 +
 ====== DavisGig Goals and Organizational needs ====== ====== DavisGig Goals and Organizational needs ======
  
Line 19: Line 41:
   * Political   * Political
   * Executive ​   * Executive ​
 +
 +
 +
  
operations.1421998083.txt.gz ยท Last modified: 2015/01/22 23:28 by shneor